Ocean's Edge Suite

Our Signature Room

Ocean's Edge Suite

Our Signature Room

Live on the edge. The Ocean’s Edge Suite is our signature room, featuring one King bed with pillow-top mattress and premium duvet bedding, along with its defining feature – an uninhibited view of the beautiful Rocky Harbour waterfront through three large bay windows. Take in the Lobster Cove Head Lighthouse and stunning sunsets! This luxury suite also features plush carpets, cozy fireplace, granite bar, leather furniture, and a 3-piece bath with luxury shower.

Also includes 37” flat-screen TV with cable and USB access; USB charging ports; table and chairs; refrigerator; microwave; free high-speed wireless Internet (all rooms).  This room measures a generous 410 sq. ft.

All Sundowner Rooms have large ocean facing private decks with chairs and a small table. The perfect place to sit and watch Rocky Harbour’s amazing sunsets!

Room Amenities

    • Unobstructed Harbour View
    • King bed with pillow top mattress
    • Plush carpets
    • Granite Bar
    • Leather Furniture
    • Fireplace
    • Three piece bath with luxury shower
    • Iron and ironing board
    • Fridge and microwave
    • 37″ Flat Screen Television
    • Room service 
img-6